Services/Electrical·EL-02

HEP ODS grid connection declaration

Testing for connection to the HEP ODS distribution grid and the tester's declaration (form PM) — after a renovation or a new installation.

Electrical installation testing for the HEP grid connection (insulation resistance, single-line diagram, declaration and certificate of compliance)

  • We carry out every check and test required for an HEP grid connection, including insulation resistance and the single-line diagram.
  • Once the inspection is complete, we issue the official declaration and certificates of compliance for the HEP connection.
  • Our experts are trained and experienced in these inspections and make sure every installation complies with HEP standards and regulations.

What we test

Final inspection and testing of the electrical installation and the distribution board of a flat, house or commercial space — after a renovation or when a new installation has been fitted — to confirm it meets the safety requirements:

  • protection against direct and indirect contact
  • touch voltage
  • conductor insulation resistance
  • equipotential bonding
  • protective conductor continuity
  • bonding of metal parts
  • effectiveness of the protection against electric shock

Based on the tests we issue the tester's declaration (form PM) needed to connect to the HEP ODS distribution grid.